At Hylo Tower in London, Gariff’s work as an office fit out contractor involved bringing together a £600,000 package of joinery across the 26th floor.
Working for Patriarche, our scope covered the supply and installation of wall cladding, kitchens, workstations, ceiling features and door sets, with the project completed in August 2024.
With such a varied scope across one floor, the project required each stage of the joinery package to be considered, from design information and manufacture through to supply and final installation.
A £600k joinery package across the 26th floor
The joinery package at Hylo Tower covered a broad mix of elements:
Wall cladding helps establish the visual language of a space
Kitchens need to work hard day to day
Workstations have to support how people actually use the office
Door sets are functional elements that need to sit naturally within the surrounding interior
Ceiling features add another visual layer to the space
For an office fit out contractor, that breadth means dealing with very different requirements within the same commercial office fit out, rather than repeating one type of product across the floor.
Why office joinery is about more than individual items
A schedule of joinery items tells you what needs to be delivered, but it doesn’t necessarily tell you how those elements will be used once the office is occupied.
In a workplace, joinery is often spread across areas with very different functions. Some elements are highly visible and help establish the character of the interior, while others are used constantly but are noticed most when they don’t work properly.
That’s why an office joinery contractor needs to consider both the individual requirement and the relationship between different elements.
Turning a design into a coordinated workplace interior
Patriarche was also responsible for the design of the project, which meant the joinery package formed part of a clearly defined interior scheme.
An office fit out contractor’s job isn’t simply to install what appears on a drawing. Instead, each element needs to translate from design information into something that works properly in the finished environment.
With bespoke office joinery, the challenge is maintaining what the designer intended as the scheme moves from drawings into manufacture and, eventually, the physical workplace.
What needs to be resolved before manufacture begins?
Before an office fit out contractor can move bespoke joinery into manufacture, the design information needs to be clear enough for those items to be produced accurately.
That means resolving more than the overall appearance. Dimensions need to be confirmed, finishes need to be specified and the points where joinery meets surrounding elements need to be understood before work progresses further.
There’s also a practical reason for doing this early. Questions that remain unanswered during manufacture can lead to changes later, when making adjustments may be more disruptive than resolving them at the technical stage.
This becomes especially important with office feature wall joinery and other highly visible elements, where small differences in dimensions, alignment or surrounding finishes can become noticeable in the completed interior.
For clients and design teams, detailed information at this stage helps give the manufacturing team a clear basis to work from. It also creates a more straightforward route from the approved design to the finished item, reducing the amount that needs to be interpreted once work reaches site.
Why the installation stage matters
Good joinery can still be let down by poor installation.
Once items arrive on site, the focus shifts from what’s been specified to how precisely each element fits its actual surroundings.
For a workplace fit out contractor, installation is where even small discrepancies can affect the fit, operation and finish of the completed joinery.
At Hylo Tower, we were responsible for both supply and installation, taking the joinery package through to completion.
That continuity matters because the finished result is judged on what people see and use, not simply on what was originally specified.
What changes when an office fit out is delivered on an upper floor?
With the Hylo Tower joinery package installed on the 26th floor, the project also highlights an important consideration for upper-floor office schemes: how materials and finished items physically reach the space where they’re needed.
On upper-floor projects, an office fit out contractor needs to consider factors such as access routes, lift capacity, the dimensions of finished items, available storage and the order in which materials arrive.
Those details can influence decisions long before installation begins. A large item may need to be manufactured or transported in sections, while deliveries may need to arrive in a particular sequence so the floor doesn’t become crowded with materials that aren’t yet required.
Protection matters too. Joinery has already gone through manufacturing and finishing by the time it reaches site, so it needs to arrive at its final location without damage along the way.
What should clients look for in an office fit out contractor?
When a workplace project includes a substantial joinery package, the right contractor needs to offer more than the ability to supply individual items.
Clients and design teams should be looking at how the contractor will manage the package from one element to the next.
To do that, these questions can be helpful:
Can the contractor handle several different types of joinery within one package?
How will bespoke elements be coordinated with the wider interior?
Who is responsible for installation as well as supply?
How will the team manage interfaces between joinery and surrounding finishes?
Can the contractor maintain the same standard across both feature pieces and functional items?
Those questions help clients assess whether a contractor can take responsibility for the whole joinery scope, rather than simply manufacture or install individual items.
A completed office fit out at Hylo Tower
Completed in August 2024, the £600,000 Hylo Tower project adds another substantial office scheme to Gariff’s portfolio and demonstrates the range of workplace joinery we can deliver within a commercial environment.
If you’re looking for an office fit out contractor for a workplace, corporate interior or bespoke joinery project, get in touch with the Gariff team to discuss your next scheme.